| American Airlines Alliance M&E Base, Fort Worth, TX |
This was a 2½ year, $400
million, fast track design-build project to construct a modern wide
bodied jet aircraft maintenance facility.
|
| Arkansas Power & Light Company, Little Rock, AR |
The above photo is from
existing 345kV and 500kV guyed tower foundations. Structures on the
left are on a new 500kV circuit and those on the right are on a 20 year
old 345kV circuit.
|
| Bridgeline Gas Distribution Company, New Orleans, LA |
A recently installed
supervisory control and data acquisition (SCADA) system was
experiencing repeated lightning and/or power line surge failures.
|
| Burke Royalty Company, Wichita Falls, TX |
Wells in this field were
drilled to the 5,000 to 6,000 foot range. One well had already required
workover due to a casing corrosion failure.
|
| Dallas Area Rapid Transit (DART) Dallas, TX |
Construction of approximately 20 miles of dual track Light Rail Transit comprising the "Starter System."
|
| Induced A C Studies |
In the last three to four
decades, the incidence of joint occupancy of the same right-of-way by
one or more pipelines and power lines has increased.
|
| Sulfur Recovery Plant for major oil company, Santa Barbara, CA |
On-site coating inspection services for the project.
|
| Toulene Remediation Process Train for Plant Wastewater |
Client requested a change
in metallurgy for improved corrosion resistance.
|