On-site coating inspection services for the project. The project specification consisted of three coat system, involving inorganic zinc primer, followed by an aliphatic polyurethane midcoat, with a final coat of polyamide epoxy for all skids and uninsulated piping. There is an estimated 5 miles of piping on all skids with sizes ranging from 1/2" to 10" including electric conduit and insulated pipe.