Dallas Area Rapid Transit (DART) Dallas, TX

Construction of approximately 20 miles of dual track Light Rail Transit comprising the "Starter System." During system construction ELK performed corrosion control acceptance tests which included water line cathodic protection, protective coatings, electrical continuity, electrical grounding and track-to-earth resistance tests on various segments of the project to assure conformance with project specifications.

We are now the corrosion engineers for the DART operations group.